Posted on Jul 23, 2015 in Wall & Roof Framing | 0 comments

Now that we have selected our featured windows for the front face of The Wedge, the class was excited to learn how to frame our distinct wedge-shaped wall. We are doing things a little out of sequence because we have not finished insulating the floor or installing the subfloor, but we really wanted to see how the wall would look standing on the trailer before we wrap up our Summer Semester here at Laney College.


 Framing the 1st Wall-c 7-16-15 Framing the 1st Wall-b 7-16-15

Framing the 1st Wall-d 7-16-15